PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Sprinkler head at the 2nd floor Facing North.jpg 1st block course at the 2nd floor detention cell Facing East.jpg 3rd floor interior metal framing Facing East.jpg 3rd floor interior metal framing Facing South.jpg 4th floor interior metal framing Facing South-West.jpg Electrical split wire at for the 3rd floor motorized dampers Facing South.jpg Installed low roof curbs Facing East.jpg Installed roof curbs at the high roof Facing West.jpg Installing storm piping at the 3rd floor Facing North.jpg
Previous pageNext page 4th floor interior metal framing Facing South-West
4th floor interior metal framing Facing South-West